PT. Supra Surya Indonesia

 

 

PT. ADARO INDONESIA

  • Optimisasion of Hopper 1-7 Kelanis Upgrade (IDR 270,065,573,053.00)

 

PT. GUNTA SAMBA (IDR 118,000,000,000.00)

  • Palm Oil Factory Cap. 60 TPH Project (Civil) (IDR 27,000,000,000.00)
  • Palm Oil Factory Cap. 60 TPH Project (Mechanical) (IDR 73,000,000,000.00)
  • Bulking Station (Scope Earth Work, Civil Work, Machinery Work, Electrical Work, and Jetty) (IDR 18,000,000,000.00)

 

PT. INSERA SENA (POLYGON) (IDR 1,190,223,000.00)

  • Procurement & Installation Paving Stone K500 Brand conblock Thickness 8 cm Color Grey and Kanstein Type RG2 Brand Conbloc (IDR 1,125,223,000.00)
  • Additional work on the Roof Flashing Assembly Building (IDR 65,000,000.00)

 

PT. PRIMACIPTA BAJA UTAMA

  • Fabricated Steel Construction Temporary Storage Filters & Hose and Muster Room in Sangata (IDR 269,100,000.00)

 

PT. PETROSEA, tbk

  • Part Cost for Column Stiffener Line 1 (IDR 384,654,545.00)
  • Fabricated Pull Point Anchorage Line 1 AS Detail (IDR 35,072,000.00)

 

PT. RETROINDO NUSANTARA

  • Work Warehouse Size 20M x 54M = 1,080 M2 (IDR 145,000,000.00)

 

PT. TIGA BINTANG TERANG

  • Structural Steel Fabrication Work for Additional Stacking Conveyor 2B (IDR 86,168,050,090.00)

 

WILMAR GROUP (IDR 14,126,453,110.00)

  • Foundations Tank Cooling Tower (IDR 66,000,000.00)
  • Civil Works and Steel Incinerator (IDR 96,250,000.00)
  • Construction of RO Plant (IDR 440,000,000.00)
  • Chemical Warehouse Utility Area Project (IDR 38,500,000.00)
  • Work Structural Steel Plant Main Building Mes (IDR 8,056,524,300.00)
  • Steel Structure Manufacture Mes Chemical Storage Plant (IDR 179,850,000.00)
  • Structure in Mes Cooler Equipment Building (IDR 108,900,000.00)
  • Equipment Erection Works in Mes Building (IDR 289,300,000.00)
  • Installation 12 Unit Tank in Mes Plant (IDR 151,800,000.00)
  • Work Structural Steel Pipe Rack to Jetty (IDR 2,411,328,810.00)
  • Texturing Warehouse Job Creation Foundation Plant (IDR 2,288,000,000.00)