PT. BANK RAKYAT INDONESIA (PERSERO)
- Renovation Workspace Kanis BRI Bandung (IDR 384,654,545.00)
PT. CHEIL JEDANG INDONESIA
- Fabrication and Erection of New Coal Boiler 21 Tonne Facility Extention (USD 445,500,000.00)
PT. INSERA SENA (POLYGON) (IDR 58,306,377,000.00)
- Building of Bicycle Plant, Incluiding Assembly Building, Loading - Unloading Area Building, Non Asrs Building, Asrs Building, Gutter, and Fence (IDR 51,726,377,000.00)
- Cladding Work of Polygon Bicycle Plant for PT. Insera Sena (IDR 4,150,000,000.00)
- Doors, Windows, Sills Work at PT. Insera Sena (IDR 2,430,000,000.00)
PT. LINTANG ANDALAN MAKMUR
- Fabrication of Casing Cooler, Sandblasting, dan Painting, Incuding Preassembly (IDR 192,500,000.00)
PT. RETROINDO NUSANTARA
- Slicer Machine Fondation Work of MLP at PT.Retorindo Nusantara - Gresik, East Java (IDR 145,000,000)
PT. ROBERTS SCHAEFER SOROS INDONESIA (USD 3,200,860.00)
- Fabrication of Truss Frame, Sandblasting, and Galvanizing, Incluiding Preassembly and Shipping to Tanjung Bara Jeti Port of KPC (Kaltim Prima Coal) (USD 1,389,852.20)
- Supply, Fabrication, and Delivery 250T Surge Bin Package Sangata Coal Handling System (USD 373,353.00)
- Supply, Fabrication, and Delivery for Marine Transfer Tower 14.400 Port Coal Handling and Storage 2 Conveyor System of PT. Kaltim Prima Coal (USD 136,655.95)
- Supply, Fabrication, and Delivery of 250 Tonne Surge bin Package Sangata Coal Handling System (USD 483,827.25)
- Supply, Fabrication, and Delivery of Stacker Conveyor #14.150 and reclaim conveyor #14.250 (USD 204,624.56)
- Supply, Fabrication, and Delivery for Conveyr #4 Magnet Support Stell KPC #9.545 Sangata Coal Handling Facility PT. Kaltim Prima Coal (USD 168,252.17)
- Supply, Fabrication, and Delivery of Belt Feeder #14.430, OLC Discharge Chute 13 00, SPillage Conveyor #13.090 and Stock Pile Transfer Conveyor #14.090 Sangata Coal Handling Facility, PT. Kaltim Prima Coal (USD 444,295.40)
WILMAR GROUP (IDR 9,076,345,953.00)
- Civil Work, and Steel Structure Work for Feeding & RP Bagging Building at Gresik, East Java (IDR 3,195,935,953.00)
- Civil Work and Steel Structure of Rock Grinding and Hopper of RP Bagging Building (IDR 1,030,700,000.00)
- FOndation and Steel Structure Work of Raw Material, Bagging, Feeding, and Rock Grinding Building (IDR 4,150,000,000.00)
- Fabrication Work of Single Leg Intermediate, Crosing Gantry, Platform, Grouting, Finishing and Glider Bagging (IDR 699,710,000.00)